Header Ads

Header ADS

Geyser According to Vastu



Geyser According to Vastu


Vastu for Geyser Placement


Geyser and other electrical appliances like heater and switchboard should be installed in South-East corner of bathroom. Bathtub must be located in West portion and provision for washbasin could be made in North-east. There should be windows or ventilators in the east or the north. Bath should be taken in the west side.


Geyser unit must be installed at correct height from the ground. A minimum height of 1.8 meters from ground is recommended for geyser installation. To ensure safety, geyser should be fitted away from wet and damp areas like bathtubs and shower areas


Electric geyser is an essential and widely used home appliance. Correct installation of geyser is very important to ensure effective operation and end user safety. Geyser installation should be done as per manufactures guidelines. It is advisable to call qualified electrician or plumber for installation.


Important Points for Geyser Installation


Sufficient Space: Ensure that there is sufficient space available for geyser unit. The area or the space must be in-accordance with the size of electric geyser. Always consider the geyser size before installing it in the bathroom or kitchen. Adequate space helps in proper cleaning and servicing of geyser unit.


Correct Height from the Ground: Geyser unit must be installed at correct height from the ground. A minimum height of 1.8 meters from ground is recommended for geyser installation. To ensure safety, geyser should be fitted away from wet and damp areas like bathtubs and shower areas.


Firm Wall Structure: For correct and firm installation of geyser, it is very important to prepare the wall suitably. Firstly, a wall plate or frame is fixed on the wall and then geyser is installed on the plate. In case of solid walls hole must be properly drilled and in line to fix wall plate. Special care must be taken in case of hollow brick wall. For hollow brick wall, dig up sufficient space and fill the dug up space with concrete cement. When the cement dries and sets firmly, drill holes for fixing wall plate and later install your geyser. In both cases, fix the wall plate firmly with bolts in order to carry the weight of geyser unit (with water) safely.


Unblocked Water Pipes: Before geyser installation get your water pipes checked for any blockage. Make sure that the pipes are clean and clog free for smooth water flow.


Safe Electrical Connections: When making the electrical connections for geyser, always make sure that the electrical supply has the proper overload fuse or MCB protection. Also make sure that the water heater or geyser and electrical supply are properly grounded.


No comments

Powered by Blogger.